Infrastructure · 03

Nosim Link Road

An accessible street-upgrading concept shaped around local corridor conditions

Visual material from Nosim Link Road
LocationNgong, Kajiado County, Kenya
Period2026
StatusIndependent discussion concept, not for construction
AttributionPZGL Studios independent concept study
Overview

One corridor, several street responses

This independent concept tests how an approximately three-kilometre peri-urban link road could be upgraded without imposing one uniform cross-section. The brief responds to terrain, frontage activity, public-transport interfaces, school access and drainage as distinct design conditions.

Challenge

A conventional road template would overlook the corridor's changing width, slopes, access demands and pedestrian risk. The concept needed to give each segment a practical response while remaining legible as one route strategy.

Role

We led corridor interpretation, terrain response, accessible-street concepts, drainage integration and the executive design brief.

Approach
  1. Read the alignment against terrain, frontage and network role
  2. Assign context-specific street sections rather than one standard width
  3. Integrate step-free movement, passing, drainage and resident access
  4. Translate the concept into an executive brief for engineering discussion
Outputs
  • Alignment strategy
  • Context-specific street sections
  • Drainage and access concepts
  • Executive design brief
What This Demonstrates
  • Terrain-led street planning under real corridor constraints
  • Universal access integrated with drainage and vehicle movement
  • Early-stage design communicated for the next technical decision
Where This Applies

Bring this capability to a live brief.

County roads teams and engineering consultants often need a clear planning brief before survey, costing and detailed design. We structure the corridor problem and identify the decisions that the next technical stage must resolve.

Next project

Kenya Topographic Atlas

Open project ↗